Arkwright House & Ryehill are both local authority housing developments on a regenerated footprint adjacent to the main train station in Nottingham. ASSL supplied two of the first floor frames comprising of aprx 12te each of structural steel works inclusive of shelf support beams to allow a shadow gap detail to the ground floor windows. This steelwork was also used as a primary structure to support the PCU planks for the 1st floor.